On the 16th June we started with the transport of structural components and the installation of a double girder gantry crane with a capacity of 100/10/50 t, a span of 25.62 m + 9.5 m useful cantilever, a height of 23.25 m above level 0 + 4.8 m pit depth, at the shipyard of Balenciaga in Zumaia. We wanted to record the whole process in this video and share it with you.